Saturday, April 10, 2010

Drywall Touch-Ups


Drywall guys doing some final touch-up work. Champion Drywall did such a good job, I'm a little torn on painting over it.

Driveway (Part 2)



View of the rebar and forms. Had to re-schedule the pour for Tuesday since we ran out of rebar.

Friday, April 9, 2010

Kitchen Island (Part 3)



A view of the island countertop from a couple of vantage points. The seams still need to be cleaned up a little but the silestone looks amazing.

Kitchen Island (Part 2)


View of the silestone countertop being installed.

Transitions



View of the transition between the master bath tile and open closet. The wood panels serve as backing for the closet system.

Monday, April 5, 2010

Driveway (Part 1)



View after the road base was installed for concrete driveway.

Sunday, April 4, 2010

Septic Field


View of completed septic field. Those two concrete blocks are my car deterent system, to keep people from accidentally driving over it. Seems to be working so far.

Friday, April 2, 2010

Master Bedroom Update


Updated view of the deck from the master bedroom patio doors.

Kitchen Cabinets (Part 3)



Mostly done, just need to get the counters, cabinet pulls, and the rest of the appliances installed.

Fridge Installed



Hopefully it works when we turn it on.