Saturday, May 1, 2010

Kinda Moved In!


Yes, kinda moved in. Still have some things that need to get fixed but I envisioned our first weekend at the new house to be a lot more relaxing than how it actually was. Will update with pics as soon as everything is fairly settled and cleaned up.

Saturday, April 10, 2010

Drywall Touch-Ups


Drywall guys doing some final touch-up work. Champion Drywall did such a good job, I'm a little torn on painting over it.

Driveway (Part 2)



View of the rebar and forms. Had to re-schedule the pour for Tuesday since we ran out of rebar.

Friday, April 9, 2010

Kitchen Island (Part 3)



A view of the island countertop from a couple of vantage points. The seams still need to be cleaned up a little but the silestone looks amazing.

Kitchen Island (Part 2)


View of the silestone countertop being installed.

Transitions



View of the transition between the master bath tile and open closet. The wood panels serve as backing for the closet system.

Monday, April 5, 2010

Driveway (Part 1)



View after the road base was installed for concrete driveway.

Sunday, April 4, 2010

Septic Field


View of completed septic field. Those two concrete blocks are my car deterent system, to keep people from accidentally driving over it. Seems to be working so far.

Friday, April 2, 2010

Master Bedroom Update


Updated view of the deck from the master bedroom patio doors.

Kitchen Cabinets (Part 3)



Mostly done, just need to get the counters, cabinet pulls, and the rest of the appliances installed.

Fridge Installed



Hopefully it works when we turn it on.

Wednesday, March 31, 2010

Kitchen Island (Part 1)


View of the kitchen island cabinets. Hard to tell how they're going to look without the countertop installed. There is about 12 feet of cabinetry here, including the empty space for the dishwasher.

Tuesday, March 23, 2010

Pano Update


Panoramic shot of the exterior taken close to street level. You can actually see the metal roof.

Monday, March 22, 2010

Railing (Part 3)



Railing for the master deck and balcony.

Thursday, March 18, 2010

Railing (Part 2)


Steel railing being assembled by the front entry.

Ditch Witch




Septic guys have started digging the trenches for the leach field up front.

HVAC Units


Recently installed HVAC units. The larger one handles the first and second floors.

Wednesday, March 17, 2010

Stairs (Part 2)



All the steelwork for the supports are done. That white oak paneling is looking really good. We still have a few things to do (treads, step lights, handrail), but it's nice to finally be able to go up and down the stairs the way they were intended.

Powder Room Tile




We went with a slightly different color for the powder room (slate grey color) but retained the same vertical theme.

Kitchen Cabinets (Part 2)



All the boxes of for the kitchen cabinets are up, including the island (not pictured). I couldn't get a good wide pic so I just took two pics from each side.

Walking around the space feels great. Can't wait to try it out.