Saturday, August 8, 2009

Sunny side up


View of the south-facing walls. Those trees give some much needed cover later in the afternoon but the third floor will need some decent solar shades as it is above the tree line. The large square metal post leaning against the wall will be providing support for the third level deck off the master bedroom.

Northwest Wall


Here is a view of the northwest wall showing the future location of the front entry door (middle floor left) as well as the stairwell (empty space on right side). The openings for the master bath windows are also visible (top floor left).

Wednesday, August 5, 2009

Too Close for Comfort


The north side of the house came in a little too close to the tree so we had to make some modifications to the original design. The covered porch has been cut short instead of connecting with the covered entryway along the northwest wall.
Tree 1, House 0.

Sunday, August 2, 2009

Can't Wait to Move In


Viewed from the third level master bedroom, dusk looks like this.

Saturday, August 1, 2009

Exactly 4 feet


Raymond measuring the cantilevered balcony off the third level. What he plans on doing with these measurements, nobody knows.

Tuesday, July 14, 2009

7/14/09 Progress

Not for those prone to motion sickness


Monday, July 6, 2009

I Was Framed!

We met with our GC, the Framer, and Gerkin last Friday to take care of final decisions on windows and doors. Raymond and I decided to drop by today after work since we knew the framers had started this morning. This is the result so far. It's going to be an adventure to watch all of our ideas materialize. In 2 weeks we'll be able to walk up to the 3rd level.