Monday, September 14, 2009

See-Thru Living Room


We had a nice surprise today when we saw most of the living room windows were installed. These 10 foot tall windows comprise all 3 sides of the room and frame the fireplace.

Saturday, September 12, 2009

CMU Close Up


Detail of the CMU block showing the polished face. Each block is polished on both sides to make them smooth to the touch and bring out the color of the aggregate giving them a clean finished look.

Stage 1


The masons have set up the CMU blocks and scaffolding in preparation for the exterior stairwell wall.

Tuesday, September 8, 2009

South By Southwest


Taken from our backyard, showing some of the installed windows in the lower level as well as the master deck and balcony. This side of the house faces south by southwest.

Casement


Our favorite casement window is located in the most private bedroom in the lower level of the house. A majority of the windows are fixed, this being one of the handful of exceptions which are operable.

Tuesday, September 1, 2009

Blocks


We're off to a slow start in September due to delays from the masons. They already dropped off about half of the required polished CMU blocks that will be used on the exterior stairwell walls.

I Has A Bucket


View of the carport slab in relation to the main house.